Ohio Logistics | Bellevue, OH
Project Highlights
- Pre-engineered metal building
- 17 loading docks ~ 1 ground level overhead door, upper loading area for railroad cars. 6 overhead doors coincide with railcars, along with 2 grade level dock doors
- Over 1.38 million pounds of steel
- 5,068 yards of concrete
Project Size
192,948 sq. ft.
Star’s Role
Architectural design, project management, supervision, footers/foundations, electrical
Start/Completion Date
April 2017 – December 2017