Elyria Country Club – Maintenance Facility | Elyria, OH

Project Highlights

  • 6,656 sq. ft. equipment storage with 2,240 sq. ft. office
  • Pre-engineered steel building with (3) 12×12 ground level overhead doors and (1) 10×8 Paint Room overhead door.
  • Office construction has 2×6 wood exterior walls, metal stud Interior walls with brick wainscot and Hardie cement siding.
  • Concrete footers, foundations, garage/office floor, and asphalt driveway.
  • Finishes Include epoxy chip flooring, Kitchenette cabinetry, solid polymer toilet partitions, and acoustical tile ceiling.
  • MEPs consisted of gas tube heating, fans and louvers for ventilation, (2) Locker Rooms, (1) Superintendent restroom, and LED lighting.

Project Size

8,896 sq.ft

Start/Completion Date

April 2024 – November 2024

Star’s Role

Architectural design, project management, supervision, footers/foundations, steel building erection, metal studs, drywall, and acoustical ceilings.

Owner Contact

Pat Rodgers
Elyria Country Club
41219 Oberlin-Elyria
Elyria, OH 44035