Project Highlights
- 6,656 sq. ft. equipment storage with 2,240 sq. ft. office
- Pre-engineered steel building with (3) 12×12 ground level overhead doors and (1) 10×8 Paint Room overhead door.
- Office construction has 2×6 wood exterior walls, metal stud Interior walls with brick wainscot and Hardie cement siding.
- Concrete footers, foundations, garage/office floor, and asphalt driveway.
- Finishes Include epoxy chip flooring, Kitchenette cabinetry, solid polymer toilet partitions, and acoustical tile ceiling.
- MEPs consisted of gas tube heating, fans and louvers for ventilation, (2) Locker Rooms, (1) Superintendent restroom, and LED lighting.