Project Highlights
- Pre-engineered metal building
- 17 loading docks ~ 1 ground level overhead door, upper loading area for railroad cars. 6 overhead doors coincide with railcars, along with 2 grade level dock doors
- Over 1.38 million pounds of steel
- 5,068 yards of concrete
















